Eviction drive in Salia Sahi concluded, clearing the path for Bhubaneswar’s much-needed left parallel road. Over 550 houses were demolished to build the 200-ft, six-lane alternative route. Affected slum dwellers are being rehabilitated in an affordable housing project, with construction expected to resume soon.
