logo

Eviction drive at Salia Sahi paves way for road work

Eviction drive in Salia Sahi concluded, clearing the path for Bhubaneswar’s much-needed left parallel road. Over 550 houses were demolished to build the 200-ft, six-lane alternative route. Affected slum dwellers are being rehabilitated in an affordable housing project, with construction expected to resume soon.

Read Full

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *